Ranger Boat – Flippin, AR
Additions to manufacturing spaces in six locations on the 53-acre Ranger campus, including two new structures. The additions are strategically planned to streamline production flow and increase capacity. Structures include a mold storage/processing building, a loading building, motor storage facility, and production floor space additions. Also included are a “face lift” of the manufacturing building and a new 135-car employee parking lot. All the additions are pre-engineered metal buildings, fully sprinkled, and air conditioned.